Phone: +7 (4967) 76-54-50,76-54-51,76-54-52
Russian version:

News

Installation of a Steam/hot water boiler plant with a capacity of 1,2 MW located in Serpukhov district is completed. Installation of a commercial natural gas flow rate measuring station located in Serpukhov district is initiated.
A block-modular boiler house with a capacity of 2.0 MW intended for heat supply of a industrial facility in Norofominsk district has been put into operation. Installation of a Steam/hot water boiler plant with a capacity of 1,2 MW located in Serpukhov district is initiated.
A block-modular boiler house with a capacity of 2.0 MW in Podolsk district has been put into operation. Installation of a hot water boiler plant with a capacity of 2,0 MW located in Serpukhov district is completed.
Erection of high-pressure gas pipeline 400 meters long is completed in Serpukhov district.
The assembly of a hot-water boiler with a capacity of 2.0 MW in Serpukhov district has started.
The designing process of the gas supply system in Serpukhov district has started.
The designing of the hot-water boiler with a capacity of 2.0 MW in Serpukhov district has started.
A chimney (H = 20m, 2x500mm) with flues fastened on the base plate, has been manufactured and assembled.
9 of 14 1 6 7 8 9 10 11 12 14