Phone: +7 (4967) 76-54-50,76-54-51,76-54-52
Russian version:

News

A double walled free standing 30 meter high chimney (⌀ 1400 mm)  intended for energy center in Dmitrov district has been manufactured and delivered.
Installation of two block-modular boiler houses with a capacity of 0,8 MW each intended for heat supply of industrial facilities in Podolsk district of Moscow region is completed.
Installation of a block-modular boiler house with a capacity of 1,56 MW intended for heat supply of an industrial facility in Podolsk region in Moscow region is initiated.
Installation of two block-modular boiler houses with a capacity of 0,8 MW each intended for heat supply of industrial facilities in Podolsk district of Moscow region is initiated.
Installation of gas supply system for a hot water boiler plant with a capacity of 2,0 MW located in Serpukhov district is completed.
Installation of gas supply system for a frying chips line with a diathermic oil boiler located in Serpukhov district is completed.
Installation of gas supply system for a frying chips line with a diathermic oil boiler located in Serpukhov district is initiated.
Reconstruction of a commercial natural gas flow rate measuring station located in Serpukhov district is completed.
8 of 14 1 5 6 7 8 9 10 11 14