Phone: +7 (4967) 76-54-50,76-54-51,76-54-52
Russian version:

News

A double walled free standing 18 meter high chimney intended for heating plant in Sergiyev Posad has been manufactured and delivered.
Installation of gas supply system for a cogeneration plant located in Serpukhov district is completed.
An Individual heating plant with a capacity of 6.0 MW intended for heat supply of an industrial facility in Novosibirsk has been put into operation.
Installation of a block-modular boiler house with a capacity of 17.0 MW intended for heat supply of an industrial facility is initiated. Installation of a block-modular boiler house with a capacity of 2.13 MW intended for heat supply of a public facility in Podolsk city is completed.
Installation of gas supply system for a cogeneration plant located in Dmitrov district is completed.
A block-modular boiler house with a capacity of 6.1 MW intended for heat supply of LeroyMerlin distribution center has been put into operation.
A block-modular boiler house with a capacity of 1.65 MW intended for heat supply of an industrial facility in Sankt |Petersburg has been put into operation. Installation of a block-modular boiler house with a capacity of 2.13 MW
Installation of a block-modular boiler house with a capacity of 6.1 MW intended for heat supply of LeroyMerlin distribution center is completed.
4 of 14 1 2 3 4 5 6 7 14