Phone: +7 (4967) 76-54-50,76-54-51,76-54-52
Russian version:

News

Installation of a block-modular boiler house with a capacity of 2.08 MW for heat supply of facilities in Moscow, Rublevskoe ch. is initiated.
A block-modular boiler house with a capacity of 6.7 MW  is delivered to the work site and mounted.
Installation of a modular boiler house with boilers operating on pellets intended for heat supply of a facility in Smolensk region is initiated.
Installation of two chimneys, 20 Meter high each, intended for a boiler house located in Moscow region is completed. Installation of a block-modular boiler house with a capacity of 6/7 MW intended for heat supply of an industrial facility in Domodedovo district Moscow region is completed.
Installation of a block-modular boiler house with a capacity of 6.7 MW for heat supply of an industrial facility in Domodedovo district Moscow region is initiated. Installation of a block-modular boiler house with a capacity of 17.0 MW intended for heat supply  in Moscow region is completed.
A block-modular boiler house with a capacity of 17.0 MW intended for heat supply of an industrial facility has been delivered to the installation site in Zhukovsky city. Installation activities are in progress now.
A block-modular boiler house with a capacity of 17.0 MW intended for heat supply of an industrial facility in Zhukovsky city has been manufactured on our production site.
A block-modular boiler house with a capacity of 2.13 MW intended for heat supply of a public facility in Podolsk city has been put into operation.
3 of 14 1 2 3 4 5 6 14